TITLE(s): SAND FILLER (mine & quarry) Fills stopes (underground openings from which ore has been mined) with sand to prevent cave-ins of ground surrounding worked out areas: Opens pipe valves to pump sand, waste minerals, and water resulting from treatment of ore, until stopes are filled sufficiently to support walls and roofs. Switches flow from one stope to another to allow time for water to drain off. Plugs holes and cracks in stope with burlap bags and scrap timber to prevent sand from leaking out when dry. May install temporary pipelines from slurry main to distribute slurry in several stopes consecutively. GOE: 05.12.03 STRENGTH: M GED: R2 M1 L1 SVP: 2 DLU: 77 ONET CROSSWALK: 98999A Production Laborers |
Language Translations | | Espaρol | Children | Lawyers | E-mail "Immigration Superhighway", "Immigration Central", "Immigration Assistant", "Immigration Expert", "Immigration Expert Pro" and "Immigration USA" are trademarks of Information Technology Associates.
© 1995 - 2015 Photius Coutsoukis and Information
Technology Associates (All Rights Reserved).
|
Previous Next Contents ONET About
CODE: 939.687-034 Buy the DOT: Download
TITLE(s):
SAND FILLER (mine & quarry)
Fills stopes (underground openings from which ore has been mined) with sand to prevent cave-ins of
ground surrounding worked out areas: Opens pipe valves to pump sand, waste minerals, and water
resulting from treatment of ore, until stopes are filled sufficiently to support walls and roofs.
Switches flow from one stope to another to allow time for water to drain off. Plugs holes and cracks
in stope with burlap bags and scrap timber to prevent sand from leaking out when dry. May install
temporary pipelines from slurry main to distribute slurry in several stopes consecutively.
GOE: 05.12.03 STRENGTH: M GED: R2 M1 L1 SVP: 2 DLU: 77
ONET CROSSWALK: 98999A Production Laborers
© 1995 - 2015 Photius Coutsoukis and Information Technology Associates (All Rights Reserved). Revised 26-May-03