Order Flags at Theodora's Flag Shop
A B C
D E F
G H I
J K L
M N O
P Q R
S T U
V W X
Y Z ?
PreviousNextSearchContentsONETLink to this SiteAbout

Spanish Simplified Chinese French German Russian Hindi Arabic Portuguese
CODE: 869.381-026Buy the DOT: Download
TITLE(s): SIGN ERECTOR I (fabrication, nec) alternate titles: sign hanger

Erects preassembled illuminated signs on buildings or other structures, according to sketches, drawings, or blueprints: Measures location for sign and marks points where holes for expansion shields are to be drilled, using measuring tape and chalk. Drills holes, using star drill. Drives expansion shield into hole with hammer, and secures lag bolts in shield, using wrench. Attaches hanging pole for sign to building front with lag bolts, and secures pole with guy wires attached from pole to lag bolts. Secures cornice hook on roof, rigs block and tackle, and hoists sign into position, or operates hydraulic boom to position sign. Secures sign to hanging pole with hooks. Makes electrical connections to power source and tests sign for correct operation. May prewire sign before installing. May use welding equipment when installing sign. May mount plastic signs with adhesives. May fabricate signs according to specifications and be designated Sign Maker (fabrication, nec).
GOE: 05.05.06 STRENGTH: M GED: R4 M2 L3 SVP: 7 DLU: 77
ONET CROSSWALK: 87899J Sign Erectors

Previous Next Contents ONET About


CODE: 869.381-026 Buy the DOT: Download
TITLE(s): SIGN ERECTOR I (fabrication, nec) alternate titles: sign hanger

Erects preassembled illuminated signs on buildings or other structures, according to sketches, drawings, or blueprints: Measures location for sign and marks points where holes for expansion shields are to be drilled, using measuring tape and chalk. Drills holes, using star drill. Drives expansion shield into hole with hammer, and secures lag bolts in shield, using wrench. Attaches hanging pole for sign to building front with lag bolts, and secures pole with guy wires attached from pole to lag bolts. Secures cornice hook on roof, rigs block and tackle, and hoists sign into position, or operates hydraulic boom to position sign. Secures sign to hanging pole with hooks. Makes electrical connections to power source and tests sign for correct operation. May prewire sign before installing. May use welding equipment when installing sign. May mount plastic signs with adhesives. May fabricate signs according to specifications and be designated Sign Maker (fabrication, nec).
GOE: 05.05.06 STRENGTH: M GED: R4 M2 L3 SVP: 7 DLU: 77
ONET CROSSWALK: 87899J Sign Erectors


© 1995 - 2015 Photius Coutsoukis and Information Technology Associates (All Rights Reserved). Revised 26-May-03