|
TITLE(s): RELAY-RECORD CLERK (utilities) Compiles, classifies, and keeps reports and records of tests performed by relay field-test crews and transmits supervisor's instructions to relay test crews of electric power company: Prepares reports and verifies accuracy of data submitted by field-test crews in company plant and substation installations. Prepares reports on maintenance and new-installation tests performed at customer's substation. Classifies, files, and issues blueprints and related documents used on construction work by field-test crews. Verifies accuracy of calculations on test reports, such as power or current transformer ratio, circuit breaker time-performance, and transformer winding resistance, using calculator. Summarizes daily field-test reports and posts data in logbooks. Relays supervisor's instructions to test crews, using communication system. GOE: 07.05.03 STRENGTH: S GED: R3 M3 L3 SVP: 5 DLU: 77 ONET CROSSWALK: 58008 Production, Planning, and Expediting Clerks |
Language Translations | | Espaρol | Children | Lawyers | E-mail "Immigration Superhighway", "Immigration Central", "Immigration Assistant", "Immigration Expert", "Immigration Expert Pro" and "Immigration USA" are trademarks of Information Technology Associates.
© 1995 - 2015 Photius Coutsoukis and Information
Technology Associates (All Rights Reserved).
|
Previous Next Contents ONET About
CODE: 221.367-054 Buy the DOT: Download
TITLE(s):
RELAY-RECORD CLERK (utilities)
Compiles, classifies, and keeps reports and records of tests performed by relay field-test crews
and transmits supervisor's instructions to relay test crews of electric power company: Prepares
reports and verifies accuracy of data submitted by field-test crews in company plant and substation
installations. Prepares reports on maintenance and new-installation tests performed at customer's
substation. Classifies, files, and issues blueprints and related documents used on construction work
by field-test crews. Verifies accuracy of calculations on test reports, such as power or current
transformer ratio, circuit breaker time-performance, and transformer winding resistance, using
calculator. Summarizes daily field-test reports and posts data in logbooks. Relays supervisor's
instructions to test crews, using communication system.
GOE: 07.05.03 STRENGTH: S GED: R3 M3 L3 SVP: 5 DLU: 77
ONET CROSSWALK: 58008 Production, Planning, and Expediting Clerks
© 1995 - 2015 Photius Coutsoukis and Information Technology Associates (All Rights Reserved). Revised 26-May-03