Order Flags at Theodora's Flag Shop
A B C
D E F
G H I
J K L
M N O
P Q R
S T U
V W X
Y Z ?
PreviousNextSearchContentsONETLink to this SiteAbout

Spanish Simplified Chinese French German Russian Hindi Arabic Portuguese
CODE: 221.367-046Buy the DOT: Download
TITLE(s): MILL RECORDER, COMPUTERIZED MILL (steel & rel.)

Compiles and feeds input data into computer that controls reduction processing of steel slabs on roughing section of hot-strip rolling mill and records mill production and operating data: Reviews rolling schedule to ascertain operational data, such as slab sizes, metallurgical analysis, and rolling sequences. Contacts heating personnel by intercom system to ascertain stock of scheduled slabs and notifies crew of deviations from rolling schedule. Notifies supervisor when data is in computer. Monitors computer readout and adjusts input data according to read failures, data errors, or when notified by heating personnel of out-of-sequence changes, no changes, or runback of slabs due to insufficient rolling temperature. Prepares production and delay reports from data in logs and information received from mill crew.
GOE: 05.03.03 STRENGTH: L GED: R3 M2 L3 SVP: 5 DLU: 77
ONET CROSSWALK: 58008 Production, Planning, and Expediting Clerks

Previous Next Contents ONET About


CODE: 221.367-046 Buy the DOT: Download
TITLE(s): MILL RECORDER, COMPUTERIZED MILL (steel & rel.)

Compiles and feeds input data into computer that controls reduction processing of steel slabs on roughing section of hot-strip rolling mill and records mill production and operating data: Reviews rolling schedule to ascertain operational data, such as slab sizes, metallurgical analysis, and rolling sequences. Contacts heating personnel by intercom system to ascertain stock of scheduled slabs and notifies crew of deviations from rolling schedule. Notifies supervisor when data is in computer. Monitors computer readout and adjusts input data according to read failures, data errors, or when notified by heating personnel of out-of-sequence changes, no changes, or runback of slabs due to insufficient rolling temperature. Prepares production and delay reports from data in logs and information received from mill crew.
GOE: 05.03.03 STRENGTH: L GED: R3 M2 L3 SVP: 5 DLU: 77
ONET CROSSWALK: 58008 Production, Planning, and Expediting Clerks


© 1995 - 2015 Photius Coutsoukis and Information Technology Associates (All Rights Reserved). Revised 26-May-03