Order Flags at Theodora's Flag Shop
A B C
D E F
G H I
J K L
M N O
P Q R
S T U
V W X
Y Z ?
PreviousNextSearchContentsONETLink to this SiteAbout

Spanish Simplified Chinese French German Russian Hindi Arabic Portuguese
CODE: 003.061-050Buy the DOT: Download
TITLE(s): PLANNING ENGINEER, CENTRAL OFFICE FACILITIES (tel. & tel.)

Conducts studies to develop data required for planning central office switching facilities, and prepares plans and schedules for acquisition and installation of equipment to meet long term and current relief requirements: Conducts studies to accumulate information on current services, equipment capacities, current traffic data and estimated acquisition and installation costs. Analyzes data and forecasts on subscriber demands and projected traffic to determine type, size, and quantity of switching equipment required. Plans and schedules equipment acquisition, and installation, considering such factors as availability, current and future costs, and other economic projections. Reviews implementation schedules on continuing basis to ensure switching facilities have capacity within objective limits for subscriber demands. Prepares modifications on implementation schedules for acquisition and installation of switching equipment due to unforeseen increase or decrease of demands for services.
GOE: 05.01.03 STRENGTH: S GED: R6 M6 L6 SVP: 8 DLU: 77
ONET CROSSWALK: 22126B Electronics Engineers, except Computer

Previous Next Contents ONET About


CODE: 003.061-050 Buy the DOT: Download
TITLE(s): PLANNING ENGINEER, CENTRAL OFFICE FACILITIES (tel. & tel.)

Conducts studies to develop data required for planning central office switching facilities, and prepares plans and schedules for acquisition and installation of equipment to meet long term and current relief requirements: Conducts studies to accumulate information on current services, equipment capacities, current traffic data and estimated acquisition and installation costs. Analyzes data and forecasts on subscriber demands and projected traffic to determine type, size, and quantity of switching equipment required. Plans and schedules equipment acquisition, and installation, considering such factors as availability, current and future costs, and other economic projections. Reviews implementation schedules on continuing basis to ensure switching facilities have capacity within objective limits for subscriber demands. Prepares modifications on implementation schedules for acquisition and installation of switching equipment due to unforeseen increase or decrease of demands for services.
GOE: 05.01.03 STRENGTH: S GED: R6 M6 L6 SVP: 8 DLU: 77
ONET CROSSWALK: 22126B Electronics Engineers, except Computer


© 1995 - 2015 Photius Coutsoukis and Information Technology Associates (All Rights Reserved). Revised 26-May-03